Skip to Content
● New Generation OEM Manufacturing Partner

Smart Modular Production

Minh Phat Modular (MPM) builds a smart manufacturing plant in Vietnam for international modular projects — modular bathroom pods, precision aluminum machining, and high-end interiors.

100% Foreign Investment Factory in Hung Yen, Vietnam AI Integrated DFM Process
Modern manufacturing plant Minh Phat Modular
Factory Area Ecoland Park 3 Industrial Zone, Hung Yen

Meeting International Standards

A new factory, designed to align with how international partners work.

Minh Phat Modular (MPM) is a 100% foreign-owned manufacturer in Vietnam, invested in synchronously to supply modular bathroom pods and high-tech precast components for real estate development groups and global construction contractors.

Our goal: a large-scale factory serving the international modularization industry, ensuring superior quality, consistent output, and safe production processes. A solid foundation based on Lean Manufacturing, Lean Data, and a culture of transparent collaboration.

100%

Investment Capital

FDI Enterprises with Global Management Standards

11,000 m²

Factory Area

Hung Yen Industrial Center, conveniently connected to Hai Phong and Hanoi ports

Hourly

Quotation Speed

DFM analysis and BoM extraction quickly by the hour, not taking many days

3 Lines

Core Products

Modular restroom, CNC extruded aluminum, and architectural interiors

Smart OEM Platform

From Drawing to Handover, Optimized by AI

Each OEM project starts from different architectural drawings. We standardize the process from drawing to finished product using AI to ensure quotations, technical documentation, and production always have a consistent data source.

Step 01

Design Support

AI cross-checks drawings with technical requirements, architectural tolerances, and MEP systems. All revisions are validated by engineers.

Step 02

Drawing to BoM

AI Claude analyzes 2D/3D drawings to create a clear material specification table (BoM) detailing accessories, dimensions, and materials.

Step 03

Estimation & Quotation

The BoM table automatically connects with the ERP system for material and labor specifications, generating detailed quotations within a few hours.

Step 04

Synchronized Production

Approved quotations are directly converted into production orders in the ERP without manual data entry, ensuring absolute accuracy.

Step 05

Smart Operations

Bilingual project report in English - Vietnamese in real time, automatically tracking assembly progress and monitoring the export supply chain.

Principles of Human Responsibility: AI supports drafting and analysis; chief engineers and management always directly review and approve all decisions.

Core OEM Capability

Modular Bathroom, Shelving & Technical Aluminum Processing

Modular bathroom production

Completed Modular Toilet Unit

Manufactured, assembled equipment and complete leak testing in the workshop according to the design drawings. Helps shorten construction progress on site and minimize construction errors.

CNC aluminum processing and shelving

CNC Processing: Shaped Aluminum & Wooden Cabinets

Technical aluminum milling, automatic robotic welding, and crafting shelving according to a directly digitized cutting list from software, ensuring absolute mechanical accuracy.

Prototype testing sample fabrication

Trial Sample & Master Sample

We produce trial samples for the investor to directly approve before mass production. The approved sample will be the measurement standard for the entire shipment.

Export assembly and packaging

Assembly, QC Inspection & Export Packaging

Water pressure testing process, marine shockproof packaging according to container diagrams and a quality inspection document set compliant with local standards.

Operating Principles

Why Do International Partners Choose MPM?

Offshore manufacturing cooperation often encounters risks due to lack of transparency. We operate based on key principles to completely eliminate these obstacles.

A Single Source of Data

All drawings, BoM specifications, QC logs, and export bills of lading are consolidated under a unified project code in the ERP system.

Human Decisions

AI accelerates extraction and analysis. The engineering team is responsible for evaluating and approving each technical decision that affects the order.

No Hidden Data

No use of separate external Excel spreadsheets. Actual data at the workshop accurately reflects 100% of the information sent to customers.

In-Depth Technical Support

We convert your architectural drawings into an optimal manufacturing plan, resolving all conflicts before materials are cut.

Built for Export

Customs certification, specialized packaging solutions for containers, and legal compliance documentation for each target market.

Lean Data

Goal: authentic information flow circulates through the factory faster than the actual material movement.

No Compromise

Quality is Verified. Safety is Paramount.

The QA system controls each module directly against the master standard sample. Safety and environmental standards always take precedence over production targets.

Approved Standard Sample

The approved sample product serves as the gold standard for quality for all modules shipped.

Inspection of Each Product

Each process stores pass/fail inspection records, water test pressure charts, and digitized storage images.

100% Traceability

Each aluminum bar and component can be traced back to the manufacturing certificate and the batch of raw materials.

Absolute Safety

Dust extraction system, welding fume filtration, wastewater treatment, and lifting solutions ensure maximum occupational safety right from the design stage of the factory.

Leadership Team & Partners

Our People & Partners

Bringing together leaders with decades of experience in international hotel investment, advanced manufacturing industry, and large-scale real estate development.

Knud Clausen
Founding & Operations

Knud Clausen (Knud)

CEO, Kubikle | Executive Leader, MPM

Founder and CEO of Kubikle. Directly manages MPM on a daily basis, establishes factory capabilities, operational standards, and connects 40 years of hands-on manufacturing experience with corporate direction.

Michael Batchelor
Projects & Business

Michael Batchelor (Mike)

Chief Operating Officer — MPM | Projects & Sales

Former Chairman of the Hotel & Resort division for the Asia-Pacific region at JLL. Responsible for international project management, market expansion, and global customer partnerships.

Paul Chakkrit
Finance & Legal

Paul Chakkrit (Paul)

Chief Operating Officer — Finance & Legal

Experience in commercial hotel investment from JLL. Specializes in contract management, cross-border legal structuring, and financial strategies supporting MPM's growth momentum.

Direct Connection Channel

Send OEM Project Request

Send your CAD drawings, Revit models, or technical requirement descriptions. Our engineering team and executive management will assess production capabilities and respond within 2 business days.

Request Reception Process

1
Send Drawings:CAD file, Revit, or PDF specifications.
2
Evaluation & Quotation:Engineers check DFM and send a detailed estimate.
3
Approve Standard Sample:Manufacture prototype modules and conduct actual acceptance.
4
Production & Export:Inspect each stage, pack in containers, and ship.

Direct Contact Project Team

Connect directly with the project manager or visit the factory office at Ecoland Park 3 Industrial Zone, Hung Yen.

Michael Batchelor

Chief Operating Officer - Projects & Sales

mike@minhphat.co

General Director & Factory Technical Division

Receive Confidential Drawings & General Requirements

info@minhphat.co